Los Alamos National Laboratory
Lab Home  |  Phone
 
 

Lujan Home| Proposal Process | Ancillary Equipment | Chemical & Sample Prep | Training Office | Web Contact

SMARTS INSTRUMENT STATUS

Instrument Status (Last updated: 2009/11/21 17:42:42)
Run Number: 61549 Title:  C22 600C Heating [RF Setpoint=300]
Run Status:  running Last Script Activity:  2009/11/21 17:37:11: Start run 61549; mah 800000 rf 300 50 2
View full script Next Script Command:  mah 0 camera 1
MAH:  374823Monitor:  98958Beam Current:  113Shutter Status:  OPEN  
Crate Status
 smartsdaq1smartsdaq2smartsdaq3smartsdaq4
T0's in Run 6824 6826 6828 6830
T0's Processed 6824 6826 6828 6830
Events/T0 86 89 87 144
Crate State running running running running
Translator and Collimation
X: 0.000 Y: -2.000 Z: 0.000 R: 45.000  
ARM: 149.999 FUD: 6.000 FLR: 6.000 CUD: -15.385 CLR: -13.962
Load Frame
Position: 44.477 Stress: -0.023 Strain: 0.670 Load Frame response: Waveform Done
Position Min: ON Stress Min: ON Strain Min: ON Cycles: 14132  
Position Max: ON Stress Max: ON Strain Max: ON   
High Temperature Vacuum Furnace
High Temperature Vacuum Furnace epcis channels not available
IR Furnace
IR Furnace epcis channels not available

Use Reload to refresh data